Design Process

While we are analysing our site we see some potential for transition between Servi and Samur Streets. therefore, our design strategy developed according to it. We already have some flow to downward to the two point in our site. To increase this flow, to strengthen these streets’ transition and relation and also to use this potential we create strip system.

prejury-2-diagrams

While we are deciding our strips first of all we base existing parcel lines and after that we think whole site as a mass and then we break this mass according to our organized parcel lines.

Then we arranged volumetric seperation of masses in strips and while doing that we decided and arranged strips’ orientation according to organized parcel lines and relation between masses. And then we decided that there should be some kind of connection between these strips. Therefore, by considering existing road and existing slit, we also created a kind of continuous slit that connect our strips.

500-site-plan

ground-level

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s